Buckingham Remodel Project

10/19/14

Home
Update Blog
Original Photos
Ripout Photos
The Framing
The Bomb Shelter
Insulation
Drywall
Electrical
Mechanical Room
Painting
Boys Rooms
Misc

 

 

 

    6/1/2009 Check out the new Update Blog

So Here are the plans Thus Far

Purchased on June 25 2007. We hope to have the main "Great room" Kitchen/dining/Living room, finished by June 25, 2008.

(ha ha ha...only 5 years behind schedule as of 0919/2013)

I am doing most of the work myself with the help from a friend, Peter Hayden.

The Plans

The Idea

Click on the links below to view documents in Acrobat Reader.  If you do not have Acrobat Reader, click the icon to download a free copy.

 

bulletThe Original Floor plan
bulletThe Current Remodeling Floor Plan
bulletBasement Plan
bulletHalloween

The main idea is to open up the small rooms and have one big common room and move the stairs out of the center of the Kitchen. We also decided to open up the hall to better connect it to the main part of the house. This allowed us to have a shelf around the hall above the bedrooms and Bath. Now I have a place to put the train!

Please check back for updates

Contact us

Google Earth Location  44°32'28.86"N  73°16'47.97"W Google Maps JavaScript API Example

 

Home (802)-658-2898  
Email:

Mark  mark.holly65@comcast.net

MaryFran mfholly@comcast.net

 
   

Home | Update Blog | Original Photos | Ripout Photos | The Framing | The Bomb Shelter | Insulation | Drywall | Electrical | Mechanical Room | Painting | Boys Rooms | Misc

This site was last updated 10/19/14